Complete guide to ADU construction and garage conversions in California. Average cost: $60,000–$300,000
Start My ADU Project →California's ADU laws have made adding a second unit faster and more profitable than ever
An Accessory Dwelling Unit (ADU) is a secondary housing unit on a single-family property — either a garage conversion, a new detached structure, a basement conversion, or an addition to the main home. California's landmark ADU legislation (AB 68, AB 2221, SB 9) has dramatically streamlined approvals, making ADU construction one of the most financially compelling projects available to California homeowners.
A well-built ADU in Southern California generates $1,500–$3,500/month in rental income, adds $150,000–$300,000 to property value, and often pays for itself in 4–7 years. With housing demand at record levels, ADUs are increasingly treated as essential infrastructure.
Garage Conversion ADU ($60,000–$130,000): Converting an existing attached or detached garage into a fully permitted dwelling unit. Most cost-effective ADU type since the structure already exists. Includes electrical, plumbing, HVAC, insulation, drywall, kitchen, bathroom, and exterior compliance.
Detached New Construction ADU ($150,000–$300,000): Building a brand new structure in the backyard. Maximum flexibility in design and size. Requires full foundation, framing, MEP, and exterior work.
Attached Addition ADU ($100,000–$200,000): Adding a new unit attached to the main house, typically over a garage or as a ground-floor addition. Shares one wall with the main structure.
Junior ADU / JADU ($25,000–$60,000): Converting existing interior space (bedroom, basement) into a studio unit. Limited to 500 sq ft. Must share a wall with main house. Less expensive but also less rental income potential.
Connect with experienced, pre-screened contractors in your area. Get multiple quotes and compare your options.
Start My ADU ProjectDetailed breakdown of what you can expect to invest in your project
Every project is unique. Get personalized quotes from local contractors who can assess your specific needs.
Start My ADU ProjectExpert advice for a successful project
Before spending money on design, have a contractor assess your lot for ADU feasibility — setbacks, utility access, soil conditions, HOA restrictions, and local overlay zones. Some lots have constraints that affect cost significantly.
Under current law, your city must approve a compliant ADU application within 60 days. They cannot require design review, public hearings, or additional parking for most ADU types. Know your rights — some cities still try to add restrictions.
If renting the ADU, design for what renters want: full kitchen, in-unit laundry hookups, private entrance, good natural light, and adequate storage. A well-designed ADU commands $300–$600/month more than a basic conversion.
ADUs can share utilities with the main house (less expensive, simpler) or have separate meters (more expensive but better for rentals and future sale as separate unit). Discuss both options with your contractor and utility company.
Design fees ($5,000–$15,000), permits ($5,000–$15,000), and utility connections ($5,000–$20,000) are in addition to construction costs. A realistic total budget includes all soft costs.
Connect with experienced professionals who can help you plan and execute your project from start to finish.
Start My ADU ProjectReal work completed by BuildDirectly contractors across Southern California
Featured project photo coming soon
Project photo coming soon
Project photo coming soon
Project photo coming soon
Project photo coming soon
Common questions about adu / garage conversion services
From initial design to move-in, plan for 9–18 months for a new detached ADU, and 6–12 months for a garage conversion. The permitting process takes 2–4 months in most cities; construction takes 3–6 months depending on complexity.
Yes — LA County and most incorporated cities in the county allow ADUs on single-family lots. The city of Los Angeles has particularly streamlined ADU approvals. Check your specific city's ADU ordinance for setback, size, and height requirements.
As of 2020, California removed the owner-occupancy requirement for ADUs. You do not need to live on the property to build or rent an ADU, though some cities may still have local requirements. Verify with your city.
Rental income varies significantly by location and size. Studio/1BR garage conversions in LA typically rent for $1,800–$2,800/month. Larger 2BR detached ADUs in desirable areas command $2,500–$4,000/month. Ventura and Riverside Counties typically run 15–25% lower than LA proper.
Not as a condo sale without subdivision, but SB 9 (effective 2022) allows lot splits on single-family parcels in many areas, which could enable separate sale. Consult a real estate attorney for your specific situation. Many owners keep both units and rent one long-term.
No — BuildDirectly is completely free for homeowners. We connect you with pre-screened local contractors. All project decisions, contracts, and payments are made directly between you and the contractor you choose.
BuildDirectly is a lead generation platform, not a contractor. We connect homeowners with pre-screened contractors but do not perform any work ourselves.
No Charges to Homeowners: Our service is always free. All costs are negotiated directly between you and the contractor you choose.
Independent Contractors: All contractors are independent businesses. We do not employ or control their work, pricing, or business practices.
Connect with experienced, pre-screened contractors in your area. Get multiple quotes, compare options, and choose the right professional. Completely free for homeowners.
Start My ADU Project